
Battery Energy Storage System (BESS) Investment Opportunity – Slovenia, EU
Description
Battery Energy Storage System (BESS) Investment Opportunity – Slovenia, EU
An attractive opportunity to acquire 100% of an established Slovenian special-purpose project company (SPV) holding the development rights for a standalone Battery Energy Storage System (BESS) project in Slovenia, within the European Union. The project benefits from an existing grid connection agreement, secured land and cable-route easements, proximity to an electricity substation and ongoing development towards Ready-to-Build (RTB) status.
The investment opportunity involves the acquisition of the entire share capital of the project-holding SPV, with the project being developed towards the building permit stage. The transaction also offers flexibility for an investor to participate in further development, optimise the battery system configuration and adjust the installed storage capacity in coordination with the local Distribution System Operator (DSO).
Project Overview and Technical Specifications
Location: Slovenia, European Union
Technology: Standalone Battery Energy Storage System (BESS)
Project structure: Existing Special Purpose Vehicle (SPV)
Transaction: Sale of 100% of the SPV's business shares
Existing grid connection capacity: 13 MW, supported by a valid grid connection agreement
Target grid connection capacity: At least 16 MW, subject to optimisation and confirmation by the DSO
Expected optimised configuration: 2 × 8 MW
Connection infrastructure: Direct proximity to an electricity substation, with a short cable route
Land arrangement: Long-term land lease with indexed annual rent
Property rights: Secured easements for the project site and cable route
Target Ready-to-Build (RTB) status: Q4 2026 / Q1 2027
The proposed battery installation is designed as a standalone energy storage facility, with system configuration options based on C-rates of 0.25, 0.33 or 0.5 and the possibility of deploying up to nine or more container units, depending on the final technical design.
Development Status and Permitting Progress
The project has already completed several important development steps, providing an established basis for further technical preparation and permitting.
Completed milestones:
Valid grid connection agreement for 13 MW obtained.
Project conditions for the site near the electricity substation obtained.
Easements secured for the project site and connecting cable route.
Ongoing development activities:
Coordination with the DSO to optimise grid connection capacity and increase the target capacity to at least 16 MW.
Spatial planning coordination with the municipality, with no objections reported.
Preparation of an updated grid connection agreement for a target capacity of at least 16.3 MW, indicated for September 2026.
Preparation of project documentation required for the building permit.
The target is to achieve Ready-to-Build status during Q4 2026 or Q1 2027, subject to completion of the remaining technical, administrative and permitting procedures.
Land, Grid Connection and Infrastructure
The project benefits from a location in close proximity to an existing electricity substation, allowing for a relatively short cable connection route.
This is an important infrastructure advantage for a standalone battery storage project, as grid accessibility and connection infrastructure are key elements of development feasibility.
The land is secured through a long-term lease agreement with indexed annual rent. The necessary easements for the project site and cable route have also been secured, providing an established framework for the development and future construction of the BESS facility.
Battery Storage Configuration and Technical Flexibility
The proposed standalone BESS project allows for flexibility in the final technical configuration, depending on the confirmed grid connection capacity and the investor's preferred operating strategy.
The indicative system configurations include:
C-rate of 0.25.
C-rate of 0.33.
C-rate of 0.5.
Possibility of installing up to nine or more battery container units.
The final system design, battery configuration and installed capacity can be optimised in coordination with the DSO and the selected technology provider.
This flexibility allows the incoming investor to participate in determining the most suitable technical configuration for the project.
Transaction Structure and Acquisition Opportunity
The proposed transaction involves the divestment of 100% of the business shares in the existing project SPV.
The project company holds the development rights and benefits from the following established project elements:
Development progress towards Ready-to-Build status.
Existing 13 MW grid connection agreement.
Ongoing grid capacity optimisation towards at least 16 MW.
Secured construction-related rights and land arrangements.
Secured easements for the project site and cable route.
Coordinated technical project design.
The transaction is structured to allow the investor to acquire the project company and continue its development towards construction readiness.
Flexible Joint Development Option
In addition to a straightforward acquisition, the seller offers the possibility of joint development with the incoming investor from the current stage onwards.
This structure provides flexibility in relation to:
Final battery system design and technical specifications.
Optimisation of the installed storage capacity.
Selection of the preferred BESS configuration.
Coordination of the final grid connection capacity.
Adjustment of the purchase price based on confirmed grid connection capacity.
A purchase price adjustment mechanism is envisaged to reflect the final confirmed grid connection capacity, providing a framework for aligning the transaction value with the achieved development parameters.
Investment Potential and Revenue Opportunities
Standalone battery energy storage systems are an increasingly important part of Europe's electricity infrastructure, supporting the integration of renewable energy, grid flexibility and electricity market balancing.
Depending on the final technical configuration, regulatory framework and market access arrangements, the Slovenian BESS project may offer potential participation in several revenue-generating activities, including:
Electricity price arbitrage: Charging the battery during periods of lower electricity prices and discharging when market prices are higher.
Grid balancing services: Potential participation in eligible balancing and ancillary service markets.
Frequency regulation: Providing grid frequency support, subject to technical qualification and market access.
Energy trading optimisation: Managing charging and discharging schedules to capture market opportunities.
Renewable energy integration: Supporting the integration and more flexible use of electricity generated from renewable sources.
The final revenue model and investment returns will depend on the installed battery capacity, C-rate, usable storage capacity, cycling strategy, electricity market conditions, grid service contracts and operating costs.
The current investment teaser does not provide a purchase price, construction CAPEX, projected annual revenues, EBITDA or financial return calculations. Consequently, project IRR, equity IRR, ROI and the investment payback period remain subject to a detailed technical and financial feasibility assessment.
Indicative Transaction Process
The proposed acquisition process is structured as follows:
Execution of a Non-Disclosure Agreement (NDA).
Submission of an indicative offer.
Due diligence, including legal, technical, commercial and financial review.
Negotiation and execution of the Share Purchase Agreement (SPA).
Transaction closing and transfer of 100% of the SPV shares.
Investment Highlights
Standalone Battery Energy Storage System investment opportunity in Slovenia, EU.
Existing 13 MW grid connection agreement.
Target grid connection capacity of at least 16 MW, subject to DSO confirmation.
Potential configuration based on two 8 MW units.
Strategic proximity to an existing electricity substation.
Short cable connection route.
Secured land lease and easements for the project site and cable route.
Spatial planning coordination progressing without reported objections.
Technical and building permit documentation in preparation.
Flexible battery configuration and capacity optimisation.
Option for joint development with the incoming investor.
Acquisition of 100% of the existing project-holding SPV.
Target Ready-to-Build status in Q4 2026 / Q1 2027.
Investment Opportunity – Slovenian Energy Storage Market
This project represents an opportunity for battery storage developers, renewable energy investors, infrastructure funds and energy companies seeking to establish or expand their presence in the European energy storage market.
The combination of an existing grid connection agreement, secured site rights, proximity to an electricity substation and flexibility in the final battery configuration provides an established starting point for further project development.
The proposed SPV acquisition structure enables an investor to take over the existing development platform and progress the standalone BESS installation towards Ready-to-Build status, with the option to participate directly in the remaining development process.
The project is offered through the sale of 100% of the shares in the existing Slovenian SPV.
Agency/brokerage agreement is signed prior to visiting all the properties. Commission depends upon particular country and region.
It is also necessary to submit presentation of your company and official Letter of Intent (LOI) for due diligence procedure.
Contact Form