48 MWp Solar PV Power Plant with 40 MW / 80 MWh Battery Energy Storage System (BESS) – Zadar County
- Land area, m²
- 323 100
Property Highlights
- Share deal
Description
48 MWp Solar Power Plant with 40 MW / 80 MWh Battery Storage – Renewable Energy Investment in Zadar County, Croatia
An opportunity to acquire an established renewable energy development project in Croatia, comprising a planned 48 MWp utility-scale solar photovoltaic (PV) power plant integrated with a 40 MW / 80 MWh Battery Energy Storage System (BESS). Located within a designated business zone in Zadar County, the project represents an opportunity for investors and renewable energy developers seeking exposure to the growing Croatian solar energy and battery storage market.
The development covers approximately 32.31 hectares (323,100 m²) and is held by an existing special-purpose vehicle (SPV), Sunčana elektrana, currently owned by eight private shareholders. The proposed transaction involves the acquisition of the project company and its existing development rights, followed by the completion of the remaining permitting and development procedures up to Ready-to-Build (RTB) status.
With energy approval already obtained and a positive environmental and ecological network decision issued, the project has progressed beyond the initial development stage. The expected RTB milestone is September 2027.
Project Description and Technical Specifications
The development combines large-scale solar electricity generation with an integrated battery storage installation, offering the technical infrastructure for renewable electricity production and energy storage.
Project location: Zadar County, Croatia
Site: Designated municipal business zone
Total land area: Approximately 32.31 hectares (323,100 m²)
Project company: SPV Sunčana elektrana
Current ownership: Eight private shareholders
Solar photovoltaic capacity: 48 MWp
Grid connection capacity: 40 MW
Battery Energy Storage System: 40 MW / 80 MWh
Project configuration: Utility-scale solar PV power plant with integrated BESS
Expected Ready-to-Build status: September 2027
Development Progress and Permitting Status
The project has already secured several important development approvals, providing a basis for its continued progression towards construction readiness.
The current documented status includes:
Energy approval obtained.
Positive decision on environmental assessment and the ecological network issued.
Grid connection procedure in progress.
Grid connection contract to be provided by HOPS, according to the project documentation.
Further development towards obtaining the final building permit.
The anticipated Ready-to-Build milestone is September 2027, subject to completion of the remaining administrative, technical and permitting requirements.
Project Development Costs and Existing Financial Commitments
The following financial information is based on the current project documentation.
Energy approval
EUR 265,444 has already been paid in full by the existing shareholders.
Grid connection
The applicable grid connection fee is EUR 19,000 per MWp, in accordance with the HERA decision dated 27 April 2026. The final amount payable and payment schedule are subject to the applicable grid connection agreement.
Land costs
The annual land cost is approximately EUR 34,000, based on a building-right agreement concluded with the municipality.
Acquisition of the project company
The stated cost for taking over the SPV and project-holding company is EUR 5,000.
Remaining development costs
The development fee covering the remaining project development activities up to the issuance of the building permit will be determined and agreed with the developer as part of the transaction.
This fee is separate from the energy approval fee, grid connection fee and land costs.
Share Acquisition Structure and Payment Schedule
The proposed transaction is structured as an acquisition of shares in the existing project-holding SPV, allowing the investor to take over the company holding the development rights for the solar PV and battery storage project.
The proposed purchase price payment schedule is as follows:
First instalment – Signing of the Share Purchase Agreement (SPA)
EUR 2,456,000 payable upon signing the Share Purchase Agreement.
Of this amount, EUR 456,000 is allocated towards payment of 50% of the amount due under the grid connection agreement.
Second instalment – Final building permit
The remaining EUR 3,000,000 is payable once the building permit has become final and legally effective.
Total scheduled transaction payments: EUR 5,456,000.
The total acquisition and development budget should additionally account for any outstanding grid connection payments, development fees, land costs and subsequent construction expenditure, depending on the final agreed transaction structure.
Investment Potential, Revenue Opportunities and ROI
The combination of a 48 MWp solar photovoltaic installation and a 40 MW / 80 MWh battery energy storage system creates several potential revenue opportunities within the Croatian electricity market.
The solar power plant is designed to generate renewable electricity, while the integrated battery storage system provides the capacity to store electricity and dispatch it at different times. Subject to market conditions, regulatory requirements and the applicable grid connection arrangements, this configuration may support several complementary revenue streams.
Potential sources of revenue include:
Solar electricity sales: Revenue from the sale of electricity generated by the 48 MWp photovoltaic installation, through electricity market trading or power purchase agreements (PPAs).
Battery energy arbitrage: Potential income from purchasing or storing electricity when market prices are lower and selling or dispatching it during periods of higher electricity prices.
Balancing and ancillary services: Potential revenues from providing eligible grid balancing, frequency regulation and other ancillary services, subject to market access and technical qualification.
Optimised energy trading: Coordinated operation of the solar power plant and BESS to improve electricity sales strategies and potentially capture additional market value.
The integrated 80 MWh battery storage capacity provides an additional commercial dimension compared with a standalone solar photovoltaic project, potentially allowing the operator to optimise the timing of electricity sales and participate in additional electricity market services.
Investment Opportunity
This project offers an opportunity to acquire a substantial renewable energy development at an advanced permitting stage in Zadar County, Croatia.
By combining utility-scale solar photovoltaic generation with an integrated battery energy storage system, the development is positioned to address two important areas of the evolving European energy market: renewable electricity production and flexible energy storage.
The existing development approvals, established project company, substantial land area and defined transaction structure make this an opportunity for renewable energy investors, infrastructure funds, energy companies and developers seeking to expand their presence in the Croatian and wider European renewable energy sector.
The project is offered through the acquisition of the existing SPV, with the objective of completing development and reaching Ready-to-Build status before proceeding to construction.
Agency/brokerage agreement is signed prior to visiting all the properties. Commission depends upon particular country and region.
It is also necessary to submit presentation of your company and official Letter of Intent (LOI) for due diligence procedure.
Contact Form